- Overview
- Product Description
- Product Parameters
- Detailed Photos
- Application
- Company Profile
- Our Advantages
- Packaging & Shipping
- FAQ
Basic Info.
Product Description
Galvanized steel wire can be known as a steel wire with a simple design in the form of a circular cylinder. The process and stages of creating galvanized steel wire involve drawing and hot-dipping metals to create electroplated zinc or can also be created by hot-dipping to produce high-quality galvanized steel wire products.
The resulting products will have many different designs, so they are widely used in various fields such as manufacturing,construction, or daily life.

Product Name | Galvanized Wire |
Package | 5kgs/roll, pp film inside and hassian cloth outside or pp woven bag outside |
25kgs/roll, pp film inside and hassian cloth outside or pp woven bag outside | |
50kgs/roll, pp film inside and hassian cloth outside or pp woven bag outside | |
Material | Q195/Q235 |
Production QTY | 1000tons/Month |
MOQ | 5 tons |
Application | Binding wire |
Payment term | T/T, L/C or Western Union |
Delivery time | about 20days after pre-payment |
Wire Gauge | SWG(mm) | BWG(mm) | Metric(mm) |
8 | 4.05 | 4.19 | 4 |
9 | 3.66 | 3.76 | 4 |
10 | 3.25 | 3.4 | 3.5 |
11 | 2.95 | 3.05 | 3 |
12 | 2.64 | 2.77 | 2.8 |
13 | 2.34 | 2.41 | 2.5 |
14 | 2.03 | 2.11 | 2.5 |
15 | 1.83 | 1.83 | 1.8 |
16 | 1.63 | 1.65 | 1.65 |
17 | 1.42 | 1.47 | 1.4 |
18 | 1.22 | 1.25 | 1.2 |
19 | 1.02 | 1.07 | 1 |
20 | 0.91 | 0.84 | 0.9 |
21 | 0.81 | 0.81 | 0.8 |
22 | 0.71 | 0.71 | 0.7 |
Q1: What's your terms of payment?
A: 30%T/T as the upfront deposit, 70% before delivery, We will show you the photos and package before you pay the balance.
Q2: What's the terms of delivery?
A: EXW, FOB, CFR, CIF
Q3: What's the terms of packing?
A: Generally,we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.
Q4: What's your delivery time?
A: For stocks, we could transport the goods to loading port within 7 work days after we received the deposit.For productionperiod, it usually takes about 15 days to 30 days after we received the deposit.
Q5: Could you produce according to the samples?
A: Yes, we can customer-made by your samples or technique drawings, we can build the mold and fixtures.